Skip to content
KR Building& Remodeling Inc.
Cleared construction site with the old pool removed and the ground prepared for a new foundation

In progress / Los Angeles

Ground-up construction, foundation through framing

A site cleared down to bare ground, an old pool removed, forms set for a new foundation, and walls and roof framed from there. This is what the first half of a ground-up build looks like before any finishes go on.

Phase 01

Clearing the site

The lot had an old pool in the way. It came out, the ground was graded, and the site was prepped for a foundation. This stage is unglamorous and it decides whether everything after it goes smoothly.

Phase 02

Foundation

Forms set to the engineered drawings, rebar tied, and the slab poured. Every dimension here is the one the framing inherits, so it gets checked before anything gets poured.

Phase 03

Framing

Walls framed, squared, and braced, then headers, shear walls, and roof framing. The photos show the structure going up in sequence, which is the part of a build most homeowners never get to watch.

Have a structure you want to put to work?

Or call (603) 264-9370

Get a Free Estimate

Photos

Foundation forms and rebar laid out across the prepared site
Close view of foundation forms and reinforcement before the pour
New wall framing standing on the slab with bracing in place
Framed corner with headers and bracing against a blue sky
Interior view of the framed walls and openings
Roof framing seen from inside, with rafters and sheathing going on

Next Step / Site Visit

Want something like this on your property?

Share a few details about your property and project. We will follow up to talk through feasibility, scope, and next steps, and schedule a site visit for a written estimate.